top of page
IMG_8200[1].JPG
IMG_7658 - Copy.jpg

How to set up and use the handrail installation jig 

Step #1: Set the Unit onto the 3rd step from the bottom, with the vertical main beam against the 4th.

 

Step #2: Loosen and adjust back legs till level, then lock in place.

 

Step #3: Loosen and adjust the head of the unit to your desired height with the digital tape located on the front of the head then lock in place.

 

Step #4: Place the handrail through the cinch strap,tighten your straps, then slide jig where the handrail will be mounted.

 

Step #5: For carpeted or slippery surfaces adjust front stabilizer leg on top of the step you are measuring your height from


Top Unit: Set Unit on second step from the top and repeat steps 1-5

IMG_7661 - Copy.jpg

MORE ABOUT THE JIG:

 

Turning a two person job into a one person job.

 

Save on time, and labor costs by up to 83%.

 

This jig has an easy setup, to find the height you need for code.

More  About Us

4  generations with a combined experience of 115 years in the field!!!

 

Created,Designed, and patented by My father Ken Bunn Sr. (a Vietnam veteran), and I Ken Bunn Jr.

 In Honor of My nephew Dennis Kavanaugh IV, a Purple heart veteran, and his son Andrew Essex who have been there every step of the way.


 

One tool, one man, one hour

bottom of page